Source-verified articles on costs, engineering and development decisions — written for people who build hydrogen projects.
This category explores hydrogen systems and project development. Articles examine technical context, practical assumptions and the questions that shape preliminary project decisions.
The electrolyzer fits on about a hectare; the solar or wind that powers it can need hundreds to thousands. A worked 100 MW example shows how much land each design needs.
ERA5, the Global Wind Atlas and PVGIS answer different questions. A worked 100 MW example shows why the dataset you choose can move hydrogen cost by more than $0.80/kg.
Desalinating seawater for an electrolyzer usually adds cents per kilogram, not dollars. A worked 100 MW example shows the cost, the flows and the risks that matter more.
Solar-only plants are simple, but they leave the electrolyzer idle every night. A worked 100 MW example shows when adding wind cuts the cost of hydrogen, and when it doesn't.