On solar vs wind for green hydrogen, the cheaper answer is often neither alone but a mix of both, because wind can keep the electrolyzer running at night when solar cannot. In the worked 100 MW example below, a hybrid supply produces hydrogen about $0.66/kg cheaper than the best wind-only design and about $2.56/kg cheaper than the best solar-only design.
Short answer: solar-only supply leaves an expensive electrolyzer idle every night, so it usually loses unless solar power is much cheaper than wind and the electrolyzer itself is cheap. Wind-only does better where wind is strong. A hybrid wins whenever both resources are reasonable, because the two fill each other's gaps and the electrolyzer runs more hours.
This is general pre-feasibility guidance, not engineering or investment advice. Confirm all figures with a site resource assessment, vendor quotations and qualified engineers.
The real project question
A developer with land and a grid-free site has to decide what to build next to the electrolyzer: a solar plant, a wind farm, or both. Solar's price per megawatt-hour can be lower; in every region of the IEA table below, good onshore wind runs more full-load hours a year. The question is not which source makes the cheapest electricity, but which supply makes the cheapest hydrogen, because the electrolyzer's fixed cost has to be spread over every kilogram it produces.
Our guide to electrolyzer utilization and the cost of hydrogen explains why idle hours are so costly. This article applies that logic to the choice of supply, as part of the power step in our green hydrogen site selection checklist.
Solar vs wind for green hydrogen: what the documented inputs say
The IEA Global Hydrogen Review 2026 assumptions annex lists generation costs and full-load hours for good resource conditions by region. For 2025:
| Region | Solar PV cost | Solar full-load hours | Onshore wind cost | Onshore wind full-load hours |
|---|---|---|---|---|
| North America | $37/MWh | 2,480 | $36/MWh | 3,640 |
| Europe | $37/MWh | 2,170 | $49/MWh | 3,460 |
| China | $23/MWh | 2,550 | $31/MWh | 3,130 |
| India | $23/MWh | 2,550 | $50/MWh | 2,900 |
Two things stand out. In North America, solar and onshore wind cost about the same per megawatt-hour, but good wind runs about 1,160 more full-load hours a year. In India, solar is less than half the price of wind. The best supply mix will not be the same in both places.
The same annex puts 2025 installed electrolysis cost at $1,920–2,500/kW as a global average and $550–1,100/kW in China, with fixed operating cost of 3% of capital a year and a 50,000-hour stack life. Its electrolysis cost excludes the power plant.
Published studies point the same way:
- An NREL study of 50,082 US sites (Grant et al., 2024) sized hybrid wind and solar plants for a 1 GW PEM electrolyzer. It found the hybrid capacity factor "is strongly driven by the wind capacity factor", that sites with higher wind capacity factors had lower hydrogen cost, and that complementary wind and solar resources lowered cost further. The highest solar capacity factor it found was 0.26. It did not model solar-only or wind-only plants.
- A Griffith University working paper (Rezaei, Akimov and Gray, 2024) modelled solar-only and wind-only plants in Gladstone, Queensland. At 10 MW, wind gave $5.8/kg against $6.1/kg for solar (dollar figures as reported in the paper), even though wind's electricity cost more, because wind's higher capacity factor offset it. At 1 GW, solar fell to $3.1/kg and wind to $3.7/kg. The answer flipped with scale at the same site. It did not model a hybrid.
The lesson from both: there is no universal winner. Resource quality, cost per megawatt-hour and electrolyzer cost all move the answer.
Worked example: solar-only vs wind-only vs hybrid for a 100 MW electrolyzer
Everything below uses illustrative assumptions, not quotes, project data or H2Hub outputs.
Stated assumptions:
- Electrolyzer: 100 MW, $2,200/kW installed (within the IEA 2025 global range), fixed operating cost 3% of capital a year
- Electricity use: 55 kWh/kg, the 2022 system status in the U.S. Department of Energy PEM electrolysis targets, held constant at all loads
- Stack replacement: $300/kW every 50,000 full-load hours, charged per hour run
- Finance: 8% discount rate over 20 years (capital recovery factor 0.10185)
- Minimum electrolyzer load: 10%; power below it is lost
- Power: dedicated solar at $37/MWh and 2,480 full-load hours, onshore wind at $36/MWh and 3,640 full-load hours (IEA North America values). Every megawatt-hour generated is paid for, including curtailed power; no export revenue
- Excluded: water, oxygen sales, compression, storage, grid connection, land, taxes and incentives
Hourly profiles: we built synthetic 8,760-hour profiles in Python and scaled them to the IEA full-load hours. Solar follows the daylight curve with longer summer days and random cloudy days. Wind follows a persistent, randomly varying wind speed that is slightly stronger at night and in winter, passed through a generic turbine power curve. The two profiles are almost uncorrelated (correlation −0.09). Real sites differ, and the benefit of a hybrid depends on how well the local wind and sun complement each other.
For each supply option, we tested renewable capacity from 1 to 4 MW per MW of electrolyzer and, for the hybrid, solar shares from 5% to 95%, then kept the cheapest design.
Results
| Supply design | Renewables per MW of electrolyzer | Full-load hours | Curtailed | Hydrogen (t/yr) | Power | Capital + fixed O&M | Stack | Cost ($/kg) |
|---|---|---|---|---|---|---|---|---|
| Solar only, 1:1 | 1.0 | 2,454 | 1.0% | 4,462 | $2.06 | $6.50 | $0.33 | $8.89 |
| Wind only, 1:1 | 1.0 | 3,571 | 1.9% | 6,493 | $2.02 | $4.47 | $0.33 | $6.82 |
| Solar only, best | 1.55 | 3,048 | 20.7% | 5,542 | $2.57 | $5.23 | $0.33 | $8.13 |
| Wind only, best | 1.70 | 4,784 | 22.7% | 8,699 | $2.56 | $3.34 | $0.33 | $6.23 |
| Hybrid, best (45% solar) | 2.15 | 5,599 | 16.5% | 10,180 | $2.39 | $2.85 | $0.33 | $5.57 |
The hybrid's advantage comes almost entirely from the capital line. It runs the electrolyzer about 5,600 full-load hours a year against about 3,000 for the best solar-only design, so the same 100 MW plant makes nearly twice as much hydrogen. It also curtails less than either single source at its best size, because wind fills the night and solar fills calm days.
Note that a 50/50 hybrid at a 1:1 ratio ($7.71/kg) is worse than wind-only at 1:1. Hybrids only pay off when they are also oversized. Our renewables-to-electrolyzer ratio guide covers that sizing step in detail.
When does solar-only win?
We reran the model with other inputs, keeping the same profile shapes.
| Case | Solar only | Wind only | Best hybrid |
|---|---|---|---|
| Base (North America values) | $8.13 | $6.23 | $5.57 (45% solar) |
| Europe values (wind $49/MWh, 3,460 h; solar 2,170 h) | $8.13 | $7.12 | $6.10 (50% solar) |
| Electrolyzer at $1,000/kW | $5.18 | $4.30 | $3.96 (45% solar) |
| Electrolyzer at $2,500/kW | $8.84 | $6.67 | $5.96 (45% solar) |
| Cheap solar, weak and costly wind (solar $25/MWh; wind $60/MWh, 2,600 h) | $7.25 | $7.85 | $6.17 (45% solar) |
| Same, with electrolyzer at $1,000/kW | $4.42 | $5.72 | $4.49 (65% solar) |
Solar-only only came out cheapest in the last case: cheap solar, poor and expensive wind, and a cheap electrolyzer. When the electrolyzer is cheap, idle night hours cost little, so the extra hours wind buys are not worth its higher price. Even then the hybrid was only $0.07/kg behind, well within the error of a screening model.
This is consistent with the Griffith result: cheaper, larger solar plants can beat wind on the same site. It also explains why very low-cost electrolyzers make solar-only projects more competitive.
What the example leaves out
- Real resource timing. Synthetic profiles cannot show how wind and sun actually line up at your site. Use measured or reanalysis data for each candidate location.
- Different build costs and schedules. Wind and solar can differ in permitting time, logistics and construction schedule at the same site. A hybrid also needs two supply chains and two sets of land rights.
- Storage and steady delivery. A buyer needing a flat supply will need hydrogen storage or backup power, which changes the best mix.
- Grid and rules. Grid top-up, export revenue for curtailed power and renewable hydrogen rules can all shift the answer.
- Part-load efficiency and degradation. The model holds efficiency constant.
Try it in H2Hub
You can start a project in H2Hub for free, without an account or a card, for the site you are screening. Use this example as your baseline: a 100 MW electrolyzer at $2,200/kW, 55 kWh/kg, and power at $36–37/MWh. Then enter your own site's location and inputs and see whether your result looks more like the solar-only or the wind-driven case above.
Your first full project and its PDF report are free; downloading the PDF needs a free sign-in. Re-running with new inputs or starting a second project requires a subscription, so screen your strongest site first. The Renewable Resource Lab is a subscriber tool for looking at resource inputs in more depth; signed-out visitors see an introduction.
A note on pre-feasibility
The figures above are calculations from stated assumptions and synthetic profiles. They are not forecasts, market prices or H2Hub-generated results, and they do not replace a site resource assessment, an hourly dispatch study or financial advice.
Frequently asked questions
Is solar or wind better for green hydrogen?
Where wind runs many more hours than solar at a similar price, wind alone usually beats solar alone. In our example, wind-only came to $6.23/kg against $8.13/kg for solar-only. Solar can win where it is much cheaper than wind and the electrolyzer is low-cost.
Why does a hybrid wind and solar plant lower hydrogen cost?
Wind can blow at night and in winter, when solar output is low or zero, so together they keep the electrolyzer running more hours. In the example, the hybrid ran about 5,600 full-load hours a year, against about 3,000 for solar alone, which spreads the electrolyzer's fixed cost over more hydrogen.
What is the best solar and wind mix for an electrolyzer?
It depends on the site. In our example the cheapest hybrid used about 45% solar capacity and 2.15 MW of renewables per MW of electrolyzer. With cheap solar and weak wind, the best mix moved to 65% solar.
Can green hydrogen run on solar power alone?
Yes, but the electrolyzer then runs only in daylight unless storage or grid power is added. That makes solar-only most attractive when electrolyzers are cheap.
Primary sources and further reading
- International Energy Agency — Global Hydrogen Review 2026: Assumptions Annex. Renewable electricity costs and full-load hours by region; electrolysis cost and operating assumptions.
- Grant, Brunik, King and Clark (NREL) — Hybrid power plant design for low-carbon hydrogen in the United States, Journal of Physics: Conference Series 2767 (2024).
- Rezaei, Akimov and Gray — Economics of renewable hydrogen production using wind and solar energy: a case study for Queensland, Australia, Griffith University CAEPR Working Paper 2024-01.
- U.S. Department of Energy — Technical Targets for Proton Exchange Membrane Electrolysis, page updated 29 May 2026.
Editorial verification: 11 November 2026. Worked examples are calculations from stated assumptions, not forecasts, market prices or H2Hub-generated results.