Stage 3 of 7 — Design·Engineer phase — Configure the system, model the economics, stress the result.
Develop the preliminary technical concept for the screened site.
Answer these to complete Level 30/2 answered
- Is the system sized from the screened site?— Screen a site first
- Have you confirmed the electrolyser and balance of plant?— Confirm or change the auto-filled equipment
What this stage needs from you
- ·Confirm the auto-filled electrolyser, power supply and water train
- ·Adjust anything you know better than the benchmark
Stage 3 of 7 done — click to continue
Screen a site first so the designer has a location and resource basis.
Conceptual, feasibility-stage schematic. Not intended for construction, permitting or procurement without review by appropriately qualified and licensed professionals. Component selections are indicative and are not vendor-endorsed. Full terms.
System configuration
Every choice redraws the schematic and the economics
Upgrade for access to SOEC (82% efficiency), AEM, and advanced PEM/Alkaline technologies
Premium: Access to Ionic, Electrochemical & Advanced Compression Technologies
Any place name or coordinates. Resource data is pulled from the screened site library around that point; the cost region is chosen for you and shown with its basis.
Your report appears below the schematic once the analysis runs.
Free Usage: 0/1 reports used
Try your free analysis above!
System schematic
Drag, zoom and inspect each component
Your feasibility report will appear here
Finish the configuration, then press “Run analysis & build report”.
Risks and gaps that remain
- ✕This is a preliminary concept, not FEED or licensed engineering.
- ⚠Equipment selections are benchmark-based until vendor quotations replace them.