Stage 2 of 7 — Screen·Frame phase — Define the project and decide if the site deserves work.
Decide whether this location and concept deserve further development.
Answer these to complete Level 20/3 answered
- Which site has been screened?— Model a site in the screener above
- Is the renewable resource known for that site?— Screen a site so resource data is attached
- How will the plant be powered?— Confirm the power supply route
What this stage needs from you
- ·Your site — pick one from the table or add your own name/coordinates
- ·Nothing else: energy, water, infrastructure, market and policy come from the dataset
Stage 2 of 7 done — click to continue
Define a project first so the screener has a concept to score against.
Add your candidate location and any parameters you already have. Anything you leave blank is completed for you from comparable sites so the project can be modelled.
Screening setup
Results update as you change what matters and the minimum you will accept.
Renewable electricity potential
Hybrid supply and utilisation
Direct production potential
Electricity conversion performance
Whole-system performance
Lower auxiliary energy demand
0 global candidate sites evaluated · 0 passed the current screening gates
Risks and gaps that remain
- ⚠Water availability and grid connection always require confirmation with local operators.
- ✕Screening uses regional data where site-specific measurements do not exist.