Indicative assumptions

    Delivered cost and the survivability rating use the assumptions below, which are not yet tied to a published source. Results that use them are tagged Indicative. Plant-gate LCOH does not use them.

    Last updated 25 October 2026

    Unsourced assumptions

    AssumptionAffectsWhat it represents
    Compression costDelivered costCost of compressing hydrogen for pipeline, truck or ammonia delivery.
    Storage costDelivered costCost of buffer storage before delivery.
    Logistics cost per 100 km (pipeline, truck, ammonia)Delivered costTransport cost scaled by route distance.
    Delivery losses (pipeline, truck, ammonia)Delivered costShare of hydrogen lost or consumed between plant and buyer.
    Utilisation shockSurvivability ratingHow far output falls in the utilisation stress test.
    Power price shockSurvivability ratingHow far electricity cost rises in the power price stress test.
    Offtake delay and cash burn shareSurvivability ratingLength of a delayed offtake and the costs that keep running meanwhile.
    Survivability price margins (soft and hard)Survivability ratingHeadroom against the offtake price used to pass or fail each stress test.

    Treat delivered cost and the survivability rating as indicative until these are replaced with sourced values. Add your own route, delivery or stress figures where you have them.