H2Hub · Intelligence

    Intelligence for your project

    Published reference data for each project-development Level — comparable projects, equipment costs, demand, policy and funding. Check the source date and evidence gaps before relying on a record.

    Back to your project workspace
    H2Hub · Data provenance

    Raw data → verified intelligence.

    2,934 project records tracked → 387 curated interactive projects → 160 H2Hub-verified flagship references. Field-level evidence can be incomplete or historical; these are not independently certified projects.

    IEA raw records
    —
    Countries covered
    —
    H2Hub verified
    160
    Operational
    —
    IEA raw
    —
    Global hydrogen production database
    Curated interactive
    387
    Deduplicated interactive collection; evidence varies by field
    H2Hub verified
    160
    Field-by-field cross-checked, geo-located, offtaker-mapped
    By project status
    By technology
    By end-product
    Top 12 countries by project count
    Methodology
    How H2Hub reconciles raw data
    1. Ingest raw IEA hydrogen production project records (— entries, unknown countries).
    2. Normalize country codes, technology labels and status categories against ISO-3 and IEA taxonomy.
    3. Cross-reference each flagship candidate with developer press releases, EPC announcements, permit filings and satellite imagery.
    4. Add engineering metadata: electrolyser OEM, power source, offtaker, LCOH range, first-of-a-kind indicator.
    5. Publish the verified layer with source citations and a public Due Diligence dossier per flagship project.

    Data: European Hydrogen Observatory (primary) · International Energy Agency (supporting) · Analysis © ReneEnergy.Sources & attribution

    The original publishers have not reviewed or endorsed this analysis.